IAC logo
IAC Assessment: UD0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1983
Principal Product COMMERCIAL PRINTINGS
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,812 5,607,855 kWh $0.05
Natural Gas $58,574 13,675 MMBtu $4.28
Other Energy $75,605 8,267 MMBtu $9.15
TOTAL ENERGY COSTS $390,991
RECOMMENDED SAVINGS* $62,548 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,287
Cost:
$562
$5,694 125,733 - - $(-2,407) (-197) - - $5,694
125,733
kWh
-
-
MMBtu
$(-2,407)
(-197)
MMBtu
-
-
$
02: 2.1392 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE Savings:
$41,500
Cost:
$80,000
- - $(-59,523) (-11,023) $101,023 8,267 - - -
-
kWh
$(-59,523)
(-11,023)
MMBtu
$101,023
8,267
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,692
Cost:
-
$5,692 - - - - - - - $5,692
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$4,855
Cost:
$17,600
$4,855 94,959 - - - - - - $4,855
94,959
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,046
Cost:
$33,000
$4,046 79,132 - - - - - - $4,046
79,132
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,168
Cost:
$400
- - - - - - $3,168 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$3,168
-
$
TOTAL RECOMMENDED Savings:
$62,548
Cost:
$131,562
$20,287 299,824 $(-59,523) (-11,023) $98,616 8,070 $3,168 - $20,287
299,824
kWh
$(-59,523)
(-11,023)
MMBtu
$98,616
8,070
MMBtu
$3,168
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Other Energy Administrative Changes Electricity Usage Natural Gas Other Energy Administrative Changes