Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1983 |
Principal Product | WOMEN'S SHOES |
NAICS | n/a |
SIC | 3144 - Women's Footwear, Except Athletic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 275 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 625,000 Pieces |
Production Hrs. Annual | 2,250 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $72,811 | 1,026,084 | kWh | $0.07 |
Natural Gas | $58,087 | 9,985 | MMBtu | $5.82 |
TOTAL ENERGY COSTS | $130,898 | |||
RECOMMENDED SAVINGS* | $18,548 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,285 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $3,030 Cost: $1,000 |
$3,030 | 40,445 | - | - |
$3,030 40,445 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $5,208 Cost: $2,000 |
- | - | $5,208 | 895 |
- - kWh |
$5,208 895 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,279 Cost: $4,668 |
$2,912 | 38,394 | $(-633) | (-109) |
$2,912 38,394 kWh |
$(-633) (-109) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $7,768 Cost: $2,000 |
- | - | $7,768 | 1,335 |
- - kWh |
$7,768 1,335 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $263 Cost: $1,590 |
- | - | $263 | 45 |
- - kWh |
$263 45 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $18,548 Cost: $11,258 |
$5,942 | 78,839 | $12,606 | 2,166 | $5,942 78,839 kWh |
$12,606 2,166 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,285 Cost: $9,668 |
$5,942 | 78,839 | $12,343 | 2,121 | $5,942 78,839 kWh |
$12,343 2,121 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |