IAC logo
IAC Assessment: UD0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1984
Principal Product ADHESIVE,CAULKS
NAICS n/a
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 360
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 8,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $439,918 8,571,806 kWh $0.05
Natural Gas $269,115 49,009 MMBtu $5.49
TOTAL ENERGY COSTS $709,033
RECOMMENDED SAVINGS* $50,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,297
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,036
Cost:
$800
- - $9,036 1,624 -
-
kWh
$9,036
1,624
MMBtu
02: 2.7441 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH Savings:
$18,921
Cost:
$21,000
- - $18,921 3,346 -
-
kWh
$18,921
3,346
MMBtu
03: 2.5194 REDESIGN PROCESS Savings:
$4,152
Cost:
$1,200
$4,152 72,392 - - $4,152
72,392
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,427
Cost:
$8,505
$8,021 131,301 $(-1,594) (-282) $8,021
131,301
kWh
$(-1,594)
(-282)
MMBtu
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$6,913
Cost:
$5,000
$(-251) (-4,982) $7,164 1,267 $(-251)
(-4,982)
kWh
$7,164
1,267
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,475
Cost:
$1,160
$1,588 39,566 $3,887 687 $1,588
39,566
kWh
$3,887
687
MMBtu
TOTAL RECOMMENDED Savings:
$50,924
Cost:
$37,665
$13,510 238,277 $37,414 6,642 $13,510
238,277
kWh
$37,414
6,642
MMBtu
TOTAL IMPLEMENTED Savings:
$41,297
Cost:
$35,305
$7,770 126,319 $33,527 5,955 $7,770
126,319
kWh
$33,527
5,955
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas