IAC logo
IAC Assessment: UD0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1984
Principal Product RUBBER PRODUCTS
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 430
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 7,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $417,555 8,573,857 kWh $0.05
Natural Gas $86,105 15,489 MMBtu $5.56
TOTAL ENERGY COSTS $503,660
RECOMMENDED SAVINGS* $37,464 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,612
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$20,480
Cost:
$5,070
$(-6,613) (-135,698) $27,093 4,795 $(-6,613)
(-135,698)
kWh
$27,093
4,795
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,818
Cost:
$900
$2,897 69,754 $(-1,079) (-191) $2,897
69,754
kWh
$(-1,079)
(-191)
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$852
Cost:
-
$852 - - - $852
-
kWh
-
-
MMBtu
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$2,038
Cost:
$4,000
- - $2,038 361 -
-
kWh
$2,038
361
MMBtu
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$7,377
Cost:
$33,750
- - $7,377 1,306 -
-
kWh
$7,377
1,306
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,899
Cost:
-
$4,899 120,750 - - $4,899
120,750
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$37,464
Cost:
$43,720
$2,035 54,806 $35,429 6,271 $2,035
54,806
kWh
$35,429
6,271
MMBtu
TOTAL IMPLEMENTED Savings:
$36,612
Cost:
$43,720
$1,183 54,806 $35,429 6,271 $1,183
54,806
kWh
$35,429
6,271
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas