IAC logo
IAC Assessment: UD0163
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0163
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1985
Principal Product MATTRESSES,BOXSPRINGS
NAICS n/a
SIC 2515 - Mattresses And Bedsprings
Sales $10,000,000-$50,000,000
# of Employees 224
Plant Area (Sq.Ft.) 0
Annual Production 240,000 Pieces
Production Hrs. Annual 4,300
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,523 3,019,050 kWh $0.07
Natural Gas $166,814 26,168 MMBtu $6.37
TOTAL ENERGY COSTS $368,337
RECOMMENDED SAVINGS* $80,705 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,516
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$19,896
Cost:
$40,000
$19,896 - - - $19,896
-
kWh
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,556
Cost:
-
$2,556 - - - $2,556
-
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,583
Cost:
$2,300
$3,181 36,049 $(-598) (-94) $3,181
36,049
kWh
$(-598)
(-94)
MMBtu
04: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$22,293
Cost:
$19,340
- - $22,293 3,518 -
-
kWh
$22,293
3,518
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,003
Cost:
$2,000
$12,950 248,828 $3,053 482 $12,950
248,828
kWh
$3,053
482
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$17,374
Cost:
$7,500
- - $17,374 2,742 -
-
kWh
$17,374
2,742
MMBtu
TOTAL RECOMMENDED Savings:
$80,705
Cost:
$71,140
$38,583 284,877 $42,122 6,648 $38,583
284,877
kWh
$42,122
6,648
MMBtu
TOTAL IMPLEMENTED Savings:
$38,516
Cost:
$11,800
$18,687 284,877 $19,829 3,130 $18,687
284,877
kWh
$19,829
3,130
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas