IAC Assessment: UD0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1985
Principal Product FIRE HOSES
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 0
Annual Production 11,000 Thousand Feet
Production Hrs. Annual 5,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,529 2,123,095 kWh $0.06
Natural Gas $65,898 10,035 MMBtu $6.57
TOTAL ENERGY COSTS $183,427
RECOMMENDED SAVINGS* $6,656 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,368
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,998
Cost:
-
$1,998 - - - $1,998
-
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$323
Cost:
$583
$323 5,862 - - $323
5,862
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,825
Cost:
$1,000
- - $1,825 285 -
-
kWh
$1,825
285
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$763
Cost:
$448
- - $763 119 -
-
kWh
$763
119
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,290
Cost:
$5,000
- - $1,290 202 -
-
kWh
$1,290
202
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$457
Cost:
$121
$79 1,758 $378 59 $79
1,758
kWh
$378
59
MMBtu
TOTAL RECOMMENDED Savings:
$6,656
Cost:
$7,152
$2,400 7,620 $4,256 665 $2,400
7,620
kWh
$4,256
665
MMBtu
TOTAL IMPLEMENTED Savings:
$3,368
Cost:
$2,152
$402 7,620 $2,966 463 $402
7,620
kWh
$2,966
463
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas