IAC logo
IAC Assessment: UD0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1986
Principal Product PRINTING INKS
NAICS n/a
SIC 2893 - Printing Ink
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 16,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,225 3,708,089 kWh $0.06
Natural Gas $134,794 28,336 MMBtu $4.76
TOTAL ENERGY COSTS $352,019
RECOMMENDED SAVINGS* $43,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,319
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$7,787
Cost:
$20,000
- - $7,787 1,636 - - -
-
kWh
$7,787
1,636
MMBtu
-
-
$
02: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$8,568
Cost:
$2,100
- - $8,568 1,800 - - -
-
kWh
$8,568
1,800
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,090
Cost:
$600
- - $1,090 229 - - -
-
kWh
$1,090
229
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,052
Cost:
$300
- - $1,052 221 - - -
-
kWh
$1,052
221
MMBtu
-
-
$
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,004
Cost:
-
$9,234 - - - $(-230) - $9,234
-
kWh
-
-
MMBtu
$(-230)
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,044
Cost:
-
$10,044 - - - - - $10,044
-
kWh
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,778
Cost:
$14,280
$5,609 98,476 $(-1,032) (-217) $1,201 - $5,609
98,476
kWh
$(-1,032)
(-217)
MMBtu
$1,201
-
$
TOTAL RECOMMENDED Savings:
$43,323
Cost:
$37,280
$24,887 98,476 $17,465 3,669 $971 - $24,887
98,476
kWh
$17,465
3,669
MMBtu
$971
-
$
TOTAL IMPLEMENTED Savings:
$34,319
Cost:
$37,280
$15,653 98,476 $17,465 3,669 $1,201 - $15,653
98,476
kWh
$17,465
3,669
MMBtu
$1,201
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes