Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1987 |
Principal Product | ALUMINUM CASTINGS |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 33 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 600 Tons |
Production Hrs. Annual | 2,500 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $148,263 | 2,541,032 | kWh | $0.06 |
LPG | $10,245 | 2,346 | MMBtu | $4.37 |
Fuel Oil #2 | $1,740 | 305 | MMBtu | $5.70 |
TOTAL ENERGY COSTS | $160,248 | |||
RECOMMENDED SAVINGS* | $12,041 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,154 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Electricity Usage | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $6,963 Cost: $3,000 |
$6,963 | - | - | - |
$6,963 - kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,230 Cost: $800 |
$1,644 | 22,567 | $(-414) | (-102) |
$1,644 22,567 kWh |
$(-414) (-102) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,924 Cost: $910 |
$2,278 | 38,687 | $(-354) | (-88) |
$2,278 38,687 kWh |
$(-354) (-88) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2514 COVER OPEN TANKS |
Savings: $1,924 Cost: $400 |
- | - | $1,924 | 477 |
- - kWh |
$1,924 477 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,041 Cost: $5,110 |
$10,885 | 61,254 | $1,156 | 287 | $10,885 61,254 kWh |
$1,156 287 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,154 Cost: $1,710 |
$3,922 | 61,254 | $(-768) | (-190) | $3,922 61,254 kWh |
$(-768) (-190) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |