Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1987
Principal Product ELECTRICAL CONNECTORS
NAICS n/a
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 0
Annual Production 8,000,000 Pounds
Production Hrs. Annual 4,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $332,077 5,517,292 kWh $0.06
Natural Gas $106,254 21,928 MMBtu $4.85
TOTAL ENERGY COSTS $438,331
RECOMMENDED SAVINGS* $44,718 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,803
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$3,915
Cost:
$20,000
$8,715 - - - $(-4,800) - $8,715
-
kWh
-
-
MMBtu
$(-4,800)
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$16,515
Cost:
-
- - $16,515 3,441 - - -
-
kWh
$16,515
3,441
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,218
Cost:
-
$8,144 211,606 $(-1,926) (-401) - - $8,144
211,606
kWh
$(-1,926)
(-401)
MMBtu
-
-
$
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$7,322
Cost:
$10,000
$7,322 163,834 - - - - $7,322
163,834
kWh
-
-
MMBtu
-
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,926
Cost:
$9,000
- - $7,926 1,661 - - -
-
kWh
$7,926
1,661
MMBtu
-
-
$
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$2,822
Cost:
$2,070
$2,870 83,236 $(-759) (-158) $711 - $2,870
83,236
kWh
$(-759)
(-158)
MMBtu
$711
-
$
TOTAL RECOMMENDED Savings:
$44,718
Cost:
$41,070
$27,051 458,676 $21,756 4,543 $(-4,089) - $27,051
458,676
kWh
$21,756
4,543
MMBtu
$(-4,089)
-
$
TOTAL IMPLEMENTED Savings:
$40,803
Cost:
$21,070
$18,336 458,676 $21,756 4,543 $711 - $18,336
458,676
kWh
$21,756
4,543
MMBtu
$711
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes