IAC Assessment: UD0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1987
Principal Product ALUMINUM BUMPERS
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 1,200,000 Pieces
Production Hrs. Annual 4,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $517,000 9,242,087 kWh $0.06
Natural Gas $460,300 88,050 MMBtu $5.23
TOTAL ENERGY COSTS $977,300
RECOMMENDED SAVINGS* $124,210 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $112,192
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$50,976
Cost:
-
$50,976 - - - - - $50,976
-
kWh
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,018
Cost:
$6,000
$12,018 199,590 - - - - $12,018
199,590
kWh
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$28,028
Cost:
$25,000
- - $28,028 8,008 - - -
-
kWh
$28,028
8,008
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$26,250
Cost:
$27,000
- - $26,250 7,500 - - -
-
kWh
$26,250
7,500
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,938
Cost:
$16,000
$7,845 133,939 $(-1,332) (-381) $425 - $7,845
133,939
kWh
$(-1,332)
(-381)
MMBtu
$425
-
$
TOTAL RECOMMENDED Savings:
$124,210
Cost:
$74,000
$70,839 333,529 $52,946 15,127 $425 - $70,839
333,529
kWh
$52,946
15,127
MMBtu
$425
-
$
TOTAL IMPLEMENTED Savings:
$112,192
Cost:
$68,000
$58,821 133,939 $52,946 15,127 $425 - $58,821
133,939
kWh
$52,946
15,127
MMBtu
$425
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes