IAC logo
IAC Assessment: UD0224
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0224
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1987
Principal Product METAL FABRICATION
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 25,000 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,952 3,080,012 kWh $0.06
Natural Gas $151,986 31,536 MMBtu $4.82
TOTAL ENERGY COSTS $343,938
RECOMMENDED SAVINGS* $14,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,313
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,584
Cost:
-
$4,584 - - - $4,584
-
kWh
-
-
MMBtu
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,048
Cost:
$7,200
- - $2,048 427 -
-
kWh
$2,048
427
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,509
Cost:
$6,000
- - $2,509 523 -
-
kWh
$2,509
523
MMBtu
04: 2.7421 REDUCE GLAZED AREAS IN BUILDINGS Savings:
$3,429
Cost:
$5,800
- - $3,429 714 -
-
kWh
$3,429
714
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,313
Cost:
$2,500
$2,979 64,771 $(-666) (-139) $2,979
64,771
kWh
$(-666)
(-139)
MMBtu
TOTAL RECOMMENDED Savings:
$14,883
Cost:
$21,500
$7,563 64,771 $7,320 1,525 $7,563
64,771
kWh
$7,320
1,525
MMBtu
TOTAL IMPLEMENTED Savings:
$2,313
Cost:
$2,500
$2,979 64,771 $(-666) (-139) $2,979
64,771
kWh
$(-666)
(-139)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas