IAC logo
IAC Assessment: UD0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1988
Principal Product MIRRORS
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 7,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,529 1,303,048 kWh $0.09
Natural Gas $27,208 4,360 MMBtu $6.24
Fuel Oil #2 $23,019 6,174 MMBtu $3.73
TOTAL ENERGY COSTS $164,756
RECOMMENDED SAVINGS* $14,612 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,987
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,160
Cost:
$500
$5,160 60,082 - - - - $5,160
60,082
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,498
Cost:
$1,600
$3,739 40,445 $(-433) (-114) $2,192 - $3,739
40,445
kWh
$(-433)
(-114)
MMBtu
$2,192
-
$
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$329
Cost:
$425
- - $329 87 - - -
-
kWh
$329
87
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,625
Cost:
$6,000
- - $3,625 958 - - -
-
kWh
$3,625
958
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$14,612
Cost:
$8,525
$8,899 100,527 $3,521 931 $2,192 - $8,899
100,527
kWh
$3,521
931
MMBtu
$2,192
-
$
TOTAL IMPLEMENTED Savings:
$10,987
Cost:
$2,525
$8,899 100,527 $(-104) (-27) $2,192 - $8,899
100,527
kWh
$(-104)
(-27)
MMBtu
$2,192
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes