IAC Assessment: UD0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1988
Principal Product ALUMINUM COOKWARE
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 700,000 Pieces
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,396 3,109,320 kWh $0.09
Natural Gas $66,824 11,299 MMBtu $5.91
TOTAL ENERGY COSTS $337,220
RECOMMENDED SAVINGS* $41,486 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,315
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,261
Cost:
-
$4,261 - - - - - $4,261
-
kWh
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$19,946
Cost:
$100,000
$27,259 276,964 $(-7,313) (-1,261) - - $27,259
276,964
kWh
$(-7,313)
(-1,261)
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,694
Cost:
$32,400
$12,256 163,540 $(-1,618) (-279) $56 - $12,256
163,540
kWh
$(-1,618)
(-279)
MMBtu
$56
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,414
Cost:
$3,400
- - $4,414 761 - - -
-
kWh
$4,414
761
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,171
Cost:
$4,000
- - $2,171 374 - - -
-
kWh
$2,171
374
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$41,486
Cost:
$139,800
$43,776 440,504 $(-2,346) (-405) $56 - $43,776
440,504
kWh
$(-2,346)
(-405)
MMBtu
$56
-
$
TOTAL IMPLEMENTED Savings:
$39,315
Cost:
$135,800
$43,776 440,504 $(-4,517) (-779) $56 - $43,776
440,504
kWh
$(-4,517)
(-779)
MMBtu
$56
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes