IAC Assessment: UD0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1988
Principal Product PLASTIC PACKAGING
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 8,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,063 5,441,090 kWh $0.04
Natural Gas $7,440 1,472 MMBtu $5.05
TOTAL ENERGY COSTS $221,503
RECOMMENDED SAVINGS* $33,912 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,844
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,844
Cost:
$17,000
$13,844 - - - - - $13,844
-
kWh
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$794
Cost:
$60
$714 15,826 - - $80 - $714
15,826
kWh
-
-
MMBtu
$80
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,565
Cost:
$18,000
- - $6,565 1,300 - - -
-
kWh
$6,565
1,300
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,829
Cost:
-
$4,829 - - - - - $4,829
-
kWh
-
-
MMBtu
-
-
$
05: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$7,880
Cost:
$5,000
$7,880 149,179 - - - - $7,880
149,179
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,912
Cost:
$40,060
$27,267 165,005 $6,565 1,300 $80 - $27,267
165,005
kWh
$6,565
1,300
MMBtu
$80
-
$
TOTAL IMPLEMENTED Savings:
$13,844
Cost:
$17,000
$13,844 - - - - - $13,844
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes