IAC Assessment: UD0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1988
Principal Product METAL STAMPINGS
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $1,000,000-$5,000,000
# of Employees 90
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pieces
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,034 890,094 kWh $0.08
LPG $18,503 2,632 MMBtu $7.03
TOTAL ENERGY COSTS $91,537
RECOMMENDED SAVINGS* $30,252 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,718
#|Description Savings
Cost
Status Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,019
Cost:
$15,000
$4,019 - - - - - $4,019
-
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,000
Cost:
-
$8,231 - - - $(-2,231) - $8,231
-
kWh
-
-
MMBtu
$(-2,231)
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,423
Cost:
$1,000
$7,043 62,720 $(-620) (-107) - - $7,043
62,720
kWh
$(-620)
(-107)
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,534
Cost:
-
$2,880 21,102 $(-346) (-60) - - $2,880
21,102
kWh
$(-346)
(-60)
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,981
Cost:
$1,500
- - $1,381 239 $600 - -
-
kWh
$1,381
239
MMBtu
$600
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,295
Cost:
$9,000
$8,444 114,596 - - $851 - $8,444
114,596
kWh
-
-
MMBtu
$851
-
$
TOTAL RECOMMENDED Savings:
$30,252
Cost:
$26,500
$30,617 198,418 $415 72 $(-780) - $30,617
198,418
kWh
$415
72
MMBtu
$(-780)
-
$
TOTAL IMPLEMENTED Savings:
$21,718
Cost:
$26,500
$19,506 177,316 $761 132 $1,451 - $19,506
177,316
kWh
$761
132
MMBtu
$1,451
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage LPG Administrative Changes Electricity Usage LPG Administrative Changes