Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1989 |
Principal Product | STRIPS & SHEETS OF STEEL |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 24 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 47,525 Pounds |
Production Hrs. Annual | 4,080 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $93,000 | 1,500,000 | kWh | $0.06 |
Natural Gas | $177,000 | 44,250 | MMBtu | $4.00 |
TOTAL ENERGY COSTS | $270,000 | |||
RECOMMENDED SAVINGS* | $204,673 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $155,620 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,690 Cost: - |
$5,554 | 92,321 | $(-784) | (-196) | $1,920 | - |
$5,554 92,321 kWh |
$(-784) (-196) MMBtu |
$1,920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,354 Cost: - |
$13,416 | 264,068 | $(-2,252) | (-563) | $3,190 | - |
$13,416 264,068 kWh |
$(-2,252) (-563) MMBtu |
$3,190 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $543 Cost: - |
$543 | 7,620 | - | - | - | - |
$543 7,620 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.5196 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS |
Savings: $1,105 Cost: $6,000 |
$1,105 | 15,826 | - | - | - | - |
$1,105 15,826 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $6,809 Cost: $12,000 |
$6,809 | - | - | - | - | - |
$6,809 - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE |
Savings: $117,912 Cost: $60,000 |
- | - | $117,912 | 29,478 | - | - |
- - kWh |
$117,912 29,478 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $47,948 Cost: $47,000 |
- | - | $47,948 | 11,987 | - | - |
- - kWh |
$47,948 11,987 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $9,312 Cost: - |
- | - | $9,312 | 2,328 | - | - |
- - kWh |
$9,312 2,328 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $204,673 Cost: $125,000 |
$27,427 | 379,835 | $172,136 | 43,034 | $5,110 | - | $27,427 379,835 kWh |
$172,136 43,034 MMBtu |
$5,110 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $155,620 Cost: $72,000 |
$26,322 | 364,009 | $124,188 | 31,047 | $5,110 | - | $26,322 364,009 kWh |
$124,188 31,047 MMBtu |
$5,110 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |