IAC logo
IAC Assessment: UD0293
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0293
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1989
Principal Product CNC GEAR ANALYZER
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 18 Pieces
Production Hrs. Annual 4,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,192 1,403,576 kWh $0.05
Natural Gas $6,426 1,448 MMBtu $4.44
TOTAL ENERGY COSTS $79,618
RECOMMENDED SAVINGS* $4,419 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,133
Cost:
-
$2,333 - - - $(-200) - $2,333
-
kWh
-
-
MMBtu
$(-200)
-
$
02: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$776
Cost:
-
$776 31,946 - - - - $776
31,946
kWh
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$725
Cost:
$1,000
- - $725 161 - - -
-
kWh
$725
161
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$498
Cost:
$39
$470 6,741 - - $28 - $470
6,741
kWh
-
-
MMBtu
$28
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$287
Cost:
-
- - $287 64 - - -
-
kWh
$287
64
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$4,419
Cost:
$1,039
$3,579 38,687 $1,012 225 $(-172) - $3,579
38,687
kWh
$1,012
225
MMBtu
$(-172)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes