IAC logo
IAC Assessment: UD0299
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0299
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1989
Principal Product DECORATIVE METAL TRIM
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $5,000,000-$10,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 800,000 Pounds
Production Hrs. Annual 4,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,298 2,111,958 kWh $0.06
Natural Gas $27,235 6,313 MMBtu $4.31
TOTAL ENERGY COSTS $148,533
RECOMMENDED SAVINGS* $12,053 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,044
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,009
Cost:
-
$7,112 5,275 $(-103) (-24) - - $7,112
5,275
kWh
$(-103)
(-24)
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$900
Cost:
-
$900 - - - - - $900
-
kWh
-
-
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,667
Cost:
$750
$1,667 - - - - - $1,667
-
kWh
-
-
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$889
Cost:
$750
$889 - - - - - $889
-
kWh
-
-
MMBtu
-
-
$
05: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$1,588
Cost:
$1,720
$1,398 27,550 - - $190 - $1,398
27,550
kWh
-
-
MMBtu
$190
-
$
TOTAL RECOMMENDED Savings:
$12,053
Cost:
$3,220
$11,966 32,825 $(-103) (-24) $190 - $11,966
32,825
kWh
$(-103)
(-24)
MMBtu
$190
-
$
TOTAL IMPLEMENTED Savings:
$5,044
Cost:
$3,220
$4,854 27,550 - - $190 - $4,854
27,550
kWh
-
-
MMBtu
$190
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes