IAC logo
IAC Assessment: UD0304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1990
Principal Product PRECISION MACHINED PARTS
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 72
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 5,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,003 1,089,683 kWh $0.06
Natural Gas $7,612 1,702 MMBtu $4.47
TOTAL ENERGY COSTS $68,615
RECOMMENDED SAVINGS* $11,188 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,818
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,855
Cost:
$2,800
$3,574 64,478 $(-1,719) (-419) - - $3,574
64,478
kWh
$(-1,719)
(-419)
MMBtu
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$867
Cost:
$1,000
$867 - - - - - $867
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,928
Cost:
$4,920
$2,196 41,325 - - $732 - $2,196
41,325
kWh
-
-
MMBtu
$732
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$332
Cost:
-
$332 13,482 - - - - $332
13,482
kWh
-
-
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,558
Cost:
$1,500
$1,441 25,791 - - $117 - $1,441
25,791
kWh
-
-
MMBtu
$117
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,648
Cost:
$7,000
$3,648 60,961 - - - - $3,648
60,961
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,188
Cost:
$17,220
$12,058 206,037 $(-1,719) (-419) $849 - $12,058
206,037
kWh
$(-1,719)
(-419)
MMBtu
$849
-
$
TOTAL IMPLEMENTED Savings:
$4,818
Cost:
$6,420
$3,969 80,598 - - $849 - $3,969
80,598
kWh
-
-
MMBtu
$849
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes