IAC logo
IAC Assessment: UD0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1990
Principal Product REFRIGERATORS,ICE MAKERS
NAICS n/a
SIC 3632 - Household Refrigerators And Freezers
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 17,500 Pieces
Production Hrs. Annual 2,500
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,938 1,359,906 kWh $0.05
Natural Gas $19,871 3,941 MMBtu $5.04
LPG $8,714 1,282 MMBtu $6.80
TOTAL ENERGY COSTS $99,523
RECOMMENDED SAVINGS* $34,566 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,979
#|Description Savings
Cost
Status Electricity Usage Natural Gas LPG Administrative Changes Electricity Usage Natural Gas LPG Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$2,239
Cost:
-
- - $(-6,475) (-1,282) $8,714 1,282 - - -
-
kWh
$(-6,475)
(-1,282)
MMBtu
$8,714
1,282
MMBtu
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,073
Cost:
$300
- - $7,073 - - - - - -
-
kWh
$7,073
-
MMBtu
-
-
MMBtu
-
-
$
03: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$1,984
Cost:
$300
- - - - - - $1,984 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$1,984
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,470
Cost:
$3,000
- - $1,470 368 - - - - -
-
kWh
$1,470
368
MMBtu
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$11,821
Cost:
$23,000
$16,861 322,978 $(-5,040) (-1,260) - - - - $16,861
322,978
kWh
$(-5,040)
(-1,260)
MMBtu
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,979
Cost:
$16,000
$11,007 210,727 $(-1,028) (-257) - - - - $11,007
210,727
kWh
$(-1,028)
(-257)
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,566
Cost:
$42,600
$27,868 533,705 $(-4,000) (-2,431) $8,714 1,282 $1,984 - $27,868
533,705
kWh
$(-4,000)
(-2,431)
MMBtu
$8,714
1,282
MMBtu
$1,984
-
$
TOTAL IMPLEMENTED Savings:
$9,979
Cost:
$16,000
$11,007 210,727 $(-1,028) (-257) - - - - $11,007
210,727
kWh
$(-1,028)
(-257)
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas LPG Administrative Changes Electricity Usage Natural Gas LPG Administrative Changes