IAC logo
IAC Assessment: UD0327
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0327
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1990
Principal Product TITANIUM ALLOY AIR FOILS
NAICS n/a
SIC 3463 - Nonferrous Forgings
Sales $10,000,000-$50,000,000
# of Employees 157
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 4,900
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $466,519 12,992,380 kWh $0.04
Natural Gas $218,893 75,842 MMBtu $2.89
TOTAL ENERGY COSTS $685,412
RECOMMENDED SAVINGS* $64,924 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,899
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,606
Cost:
$12,000
$14,606 104,045 - - - - $14,606
104,045
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$49,772
Cost:
$3,000
$50,972 (-38,101) - - $(-1,200) - $50,972
(-38,101)
kWh
-
-
MMBtu
$(-1,200)
-
$
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$1,063
Cost:
$1,000
- - $1,063 367 - - -
-
kWh
$1,063
367
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$(-1,479)
Cost:
$540
$381 8,206 - - $(-1,860) - $381
8,206
kWh
-
-
MMBtu
$(-1,860)
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$962
Cost:
$600
$106 11,430 $856 276 - - $106
11,430
kWh
$856
276
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$64,924
Cost:
$17,140
$66,065 85,580 $1,919 643 $(-3,060) - $66,065
85,580
kWh
$1,919
643
MMBtu
$(-3,060)
-
$
TOTAL IMPLEMENTED Savings:
$62,899
Cost:
$15,540
$65,959 74,150 - - $(-3,060) - $65,959
74,150
kWh
-
-
MMBtu
$(-3,060)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes