IAC Assessment: UD0362
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0362
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1992
Principal Product SCREENING/SIFTING EQUIPMENT
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 117
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,445 2,097,597 kWh $0.06
Fuel Oil #2 $11,475 1,890 MMBtu $6.07
TOTAL ENERGY COSTS $143,920
RECOMMENDED SAVINGS* $5,982 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,452
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$500
Cost:
$1,500
$500 - - - $500
-
kWh
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$810
Cost:
-
$810 - - - $810
-
kWh
-
-
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$952
Cost:
-
$1,110 14,361 $(-158) (-35) $1,110
14,361
kWh
$(-158)
(-35)
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,720
Cost:
$8,620
$4,290 55,686 $(-570) (-126) $4,290
55,686
kWh
$(-570)
(-126)
MMBtu
TOTAL RECOMMENDED Savings:
$5,982
Cost:
$10,120
$6,710 70,047 $(-728) (-161) $6,710
70,047
kWh
$(-728)
(-161)
MMBtu
TOTAL IMPLEMENTED Savings:
$1,452
Cost:
$1,500
$1,610 14,361 $(-158) (-35) $1,610
14,361
kWh
$(-158)
(-35)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas