IAC logo
IAC Assessment: UD0417
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0417
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1993
Principal Product Casted aluminum fittngs
NAICS n/a
SIC 3334 - Primary Aluminum
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 12,500
Annual Production 0 Units
Production Hrs. Annual 4,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,126 1,510,258 kWh $0.07
Natural Gas $12,624 2,480 MMBtu $5.09
TOTAL ENERGY COSTS $122,750
RECOMMENDED SAVINGS* $63,113 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,791
Cost:
-
$5,791 - $5,791
-
kWh
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$191
Cost:
$937
$191 - $191
-
kWh
03: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$57,131
Cost:
$250
$57,131 - $57,131
-
kWh
TOTAL RECOMMENDED Savings:
$63,113
Cost:
$1,187
$63,113 - $63,113
-
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage