IAC Assessment: UD0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1994
Principal Product motor vehicle body side molding
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 70,200
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $98,500 1,762,016 kWh $0.06
Natural Gas $7,257 1,446 MMBtu $5.02
TOTAL ENERGY COSTS $105,757
RECOMMENDED SAVINGS* $9,772 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,772
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$262
Cost:
-
$262 10,551 - - - - $262
10,551
kWh
-
-
MMBtu
-
-
$
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$1,105
Cost:
$1,500
$1,105 44,256 - - - - $1,105
44,256
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,283
Cost:
$1,845
$972 18,757 $(-200) (-40) $511 - $972
18,757
kWh
$(-200)
(-40)
MMBtu
$511
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,287
Cost:
$1,920
$1,321 29,601 $(-314) (-63) $280 - $1,321
29,601
kWh
$(-314)
(-63)
MMBtu
$280
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,835
Cost:
$10,000
$7,435 99,941 $(-1,600) (-320) - - $7,435
99,941
kWh
$(-1,600)
(-320)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,772
Cost:
$15,265
$11,095 203,106 $(-2,114) (-423) $791 - $11,095
203,106
kWh
$(-2,114)
(-423)
MMBtu
$791
-
$
TOTAL IMPLEMENTED Savings:
$9,772
Cost:
$15,265
$11,095 203,106 $(-2,114) (-423) $791 - $11,095
203,106
kWh
$(-2,114)
(-423)
MMBtu
$791
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes