IAC Assessment: UD0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product auto brake calipers
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 260
Plant Area (Sq.Ft.) 114,000
Annual Production 2,900,000 Pieces
Production Hrs. Annual 7,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $509,034 9,926,143 kWh $0.05
Natural Gas $85,525 16,134 MMBtu $5.30
TOTAL ENERGY COSTS $607,102
RECOMMENDED SAVINGS* $90,437 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,988
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,292
Cost:
$25,000
$11,292 - - - - - - - $11,292
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$22,105
Cost:
$70,000
- - - - - - $22,105 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$22,105
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$23,747
Cost:
$5,000
$23,747 593,200 - - - - - - $23,747
593,200
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,040
Cost:
$30,000
- - $12,040 2,408 - - - - -
-
kWh
$12,040
2,408
MMBtu
-
-
Tgal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,553
Cost:
$23,127
$11,553 242,966 - - - - - - $11,553
242,966
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$2,914
Cost:
$1,680
$2,914 67,702 - - - - - - $2,914
67,702
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,344
Cost:
-
$2,344 111,665 - - - - - - $2,344
111,665
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
08: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$4,442
Cost:
$600
- - - - $4,442 - - - -
-
kWh
-
-
MMBtu
$4,442
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$90,437
Cost:
$155,407
$51,850 1,015,533 $12,040 2,408 $4,442 - $22,105 - $51,850
1,015,533
kWh
$12,040
2,408
MMBtu
$4,442
-
Tgal
$22,105
-
$
TOTAL IMPLEMENTED Savings:
$65,988
Cost:
$85,407
$49,506 903,868 $12,040 2,408 $4,442 - - - $49,506
903,868
kWh
$12,040
2,408
MMBtu
$4,442
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes