Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1995 |
Principal Product | rag and cotton linter pulp |
NAICS | n/a |
SIC | 2823 - Cellulosic Manmade Fibers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 10,000 Tons |
Production Hrs. Annual | 8,400 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $543,836 | 10,823,271 | kWh | $0.05 |
Natural Gas | $126,112 | 36,032 | MMBtu | $3.50 |
TOTAL ENERGY COSTS | $669,948 | |||
RECOMMENDED SAVINGS* | $607,146 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $605,972 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $9,255 Cost: $3,200 |
$9,255 | - | - | - | - | - | - | - | - | - |
$9,255 - kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $9,913 Cost: $1,000 |
$(-337) | (-8,499) | - | - | - | - | $11,250 | - | $(-1,000) | - |
$(-337) (-8,499) kWh |
- - MMBtu |
- - Tgal |
$11,250 - lb |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,174 Cost: $2,605 |
$1,174 | 29,308 | - | - | - | - | - | - | - | - |
$1,174 29,308 kWh |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $41,743 Cost: $340,000 |
$3,370 | 84,115 | - | - | $59,150 | - | $(-20,777) | - | - | - |
$3,370 84,115 kWh |
- - MMBtu |
$59,150 - Tgal |
$(-20,777) - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $545,061 Cost: $4,500,000 |
- | - | $(-70,589) | (-20,168) | $620,650 | 1,869,000 | - | - | $(-5,000) | - |
- - kWh |
$(-70,589) (-20,168) MMBtu |
$620,650 1,869,000 Tgal |
- - lb |
$(-5,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $607,146 Cost: $4,846,805 |
$13,462 | 104,924 | $(-70,589) | (-20,168) | $679,800 | 1,869,000 | $(-9,527) | - | $(-6,000) | - | $13,462 104,924 kWh |
$(-70,589) (-20,168) MMBtu |
$679,800 1,869,000 Tgal |
$(-9,527) - lb |
$(-6,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $605,972 Cost: $4,844,200 |
$12,288 | 75,616 | $(-70,589) | (-20,168) | $679,800 | 1,869,000 | $(-9,527) | - | $(-6,000) | - | $12,288 75,616 kWh |
$(-70,589) (-20,168) MMBtu |
$679,800 1,869,000 Tgal |
$(-9,527) - lb |
$(-6,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes |