IAC logo
IAC Assessment: UD0461
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0461
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product specialty semi-trailers
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 145,000
Annual Production 0 Units
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,948 3,765,533 kWh $0.07
Natural Gas $6,426 1,288 MMBtu $4.99
TOTAL ENERGY COSTS $264,374
RECOMMENDED SAVINGS* $63,349 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,349
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ MMBtu $ gal $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$28,758
Cost:
$45,000
$51,000 977,726 $(-22,242) (-4,448) - - - - $51,000
977,726
kWh
$(-22,242)
(-4,448)
MMBtu
-
-
gal
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,437
Cost:
-
$4,493 - - - - - $(-56) - $4,493
-
kWh
-
-
MMBtu
-
-
gal
$(-56)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,923
Cost:
-
$3,309 40,739 $(-386) (-77) - - - - $3,309
40,739
kWh
$(-386)
(-77)
MMBtu
-
-
gal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,525
Cost:
$14,640
$9,525 114,302 - - - - - - $9,525
114,302
kWh
-
-
MMBtu
-
-
gal
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,483
Cost:
$1,000
$6,426 169,402 $(-2,943) (-589) - - - - $6,426
169,402
kWh
$(-2,943)
(-589)
MMBtu
-
-
gal
-
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$14,223
Cost:
$20,000
$(-267) (-1,465) $(-510) (-102) $15,000 11,391 - - $(-267)
(-1,465)
kWh
$(-510)
(-102)
MMBtu
$15,000
11,391
gal
-
-
$
TOTAL RECOMMENDED Savings:
$63,349
Cost:
$80,640
$74,486 1,300,704 $(-26,081) (-5,216) $15,000 11,391 $(-56) - $74,486
1,300,704
kWh
$(-26,081)
(-5,216)
MMBtu
$15,000
11,391
gal
$(-56)
-
$
TOTAL IMPLEMENTED Savings:
$63,349
Cost:
$80,640
$74,486 1,300,704 $(-26,081) (-5,216) $15,000 11,391 $(-56) - $74,486
1,300,704
kWh
$(-26,081)
(-5,216)
MMBtu
$15,000
11,391
gal
$(-56)
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ $
Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Natural Gas Other Liquid (haz) Personnel Changes