IAC logo
IAC Assessment: UD0469
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0469
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product plastic illuminated signs
NAICS n/a
SIC 3993 - Signs And Advertising Specialities
Sales $10,000,000-$50,000,000
# of Employees 137
Plant Area (Sq.Ft.) 212,500
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $183,020 2,327,374 kWh $0.08
Natural Gas $34,800 8,190 MMBtu $4.25
TOTAL ENERGY COSTS $217,820
RECOMMENDED SAVINGS* $15,585 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,483
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material
$ kWh $ MMBtu $ gal $ lb $ lb $ $ $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$3,256
Cost:
-
$3,256 - - - - - - - - - - - - - $3,256
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$2,980
Cost:
$3,000
$2,961 32,532 $(-231) (-58) - - - - - - - - $250 - $2,961
32,532
kWh
$(-231)
(-58)
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
$250
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$227
Cost:
$392
$227 3,517 - - - - - - - - - - - - $227
3,517
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,522
Cost:
$1,000
- - - - $960 150 - - $162 270 $400 - - - -
-
kWh
-
-
MMBtu
$960
150
gal
-
-
lb
$162
270
lb
$400
-
$
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,600
Cost:
$20,000
- - - - - - $7,600 40,000 - - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
$7,600
40,000
lb
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,585
Cost:
$24,392
$6,444 36,049 $(-231) (-58) $960 150 $7,600 40,000 $162 270 $400 - $250 - $6,444
36,049
kWh
$(-231)
(-58)
MMBtu
$960
150
gal
$7,600
40,000
lb
$162
270
lb
$400
-
$
$250
-
$
TOTAL IMPLEMENTED Savings:
$3,483
Cost:
$392
$3,483 3,517 - - - - - - - - - - - - $3,483
3,517
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ lb $ $ $ $
Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Primary Raw Material