Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1996 |
Principal Product | detergents |
NAICS | n/a |
SIC | 2843 - Surface Active Agents |
Sales | $10,000,000-$50,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 48,000 |
Annual Production | 60,000,000 Pounds |
Production Hrs. Annual | 7,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $68,763 | 2,361,665 | kWh | $0.03 |
Electricity Demand | $65,685 | 5,424 | kW-months/year | $12.11 |
Natural Gas | $47,846 | 10,362 | MMBtu | $4.62 |
TOTAL ENERGY COSTS | $182,294 | |||
RECOMMENDED SAVINGS* | $14,081 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,684 Cost: $3,000 |
$2,646 | 126,026 | $4,701 | 720 | $(-3,663) | (-796) | - | - | - | - |
$2,646 126,026 kWh |
$4,701 720 kW-months/year |
$(-3,663) (-796) MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $337 Cost: $150 |
$83 | 3,224 | $254 | 16 | - | - | - | - | - | - |
$83 3,224 kWh |
$254 16 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $4,498 Cost: $(-6,800) |
$1,564 | 74,443 | $2,001 | 128 | - | - | - | - | $933 | - |
$1,564 74,443 kWh |
$2,001 128 kW-months/year |
- - MMBtu |
- - Tgal |
$933 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,894 Cost: $5,615 |
$596 | 28,429 | $1,080 | 68 | - | - | - | - | $218 | - |
$596 28,429 kWh |
$1,080 68 kW-months/year |
- - MMBtu |
- - Tgal |
$218 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $3,668 Cost: $1,000 |
- | - | - | - | - | - | $3,668 | 1,798,888 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,668 1,798,888 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $14,081 Cost: $2,965 |
$4,889 | 232,122 | $8,036 | 932 | $(-3,663) | (-796) | $3,668 | 1,798,888 | $1,151 | - | $4,889 232,122 kWh |
$8,036 932 kW-months/year |
$(-3,663) (-796) MMBtu |
$3,668 1,798,888 Tgal |
$1,151 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Ancillary Material Cost |