Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1996 |
Principal Product | metal stampings |
NAICS | n/a |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 73,000 |
Annual Production | 45,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $199,009 | 6,491,794 | kWh | $0.03 |
Electricity Demand | $212,668 | 18,408 | kW-months/year | $11.55 |
Natural Gas | $34,546 | 7,527 | MMBtu | $4.59 |
TOTAL ENERGY COSTS | $446,223 | |||
RECOMMENDED SAVINGS* | $49,334 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,295 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $600 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | $600 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - gal |
$600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $9,600 Cost: $1,200 |
$6,650 | 332,649 | $5,910 | 420 | - | - | $(-2,960) | (-630) | - | - | - | - | - | - |
$6,650 332,649 kWh |
$5,910 420 kW-months/year |
- - $ |
$(-2,960) (-630) MMBtu |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $6,528 Cost: $250 |
- | - | $8,608 | 612 | $(-1,080) | - | - | - | - | - | - | - | $(-1,000) | - |
- - kWh |
$8,608 612 kW-months/year |
$(-1,080) - $ |
- - MMBtu |
- - Tgal |
- - gal |
$(-1,000) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,249 Cost: $12,150 |
$2,612 | 130,715 | $4,637 | 330 | - | - | - | - | - | - | - | - | - | - |
$2,612 130,715 kWh |
$4,637 330 kW-months/year |
- - $ |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,439 Cost: $6,000 |
- | - | - | - | - | - | $6,439 | 1,370 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$6,439 1,370 MMBtu |
- - Tgal |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER |
Savings: $18,918 Cost: $6,000 |
- | - | - | - | - | - | - | - | $1,638 | 412,170 | $17,280 | 4,320 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$1,638 412,170 Tgal |
$17,280 4,320 gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,334 Cost: $25,600 |
$9,262 | 463,364 | $19,155 | 1,362 | $(-1,080) | - | $3,479 | 740 | $1,638 | 412,170 | $17,280 | 4,320 | $(-400) | - | $9,262 463,364 kWh |
$19,155 1,362 kW-months/year |
$(-1,080) - $ |
$3,479 740 MMBtu |
$1,638 412,170 Tgal |
$17,280 4,320 gal |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,295 Cost: $18,400 |
$2,612 | 130,715 | $13,245 | 942 | $(-1,080) | - | - | - | $1,638 | 412,170 | $17,280 | 4,320 | $(-400) | - | $2,612 130,715 kWh |
$13,245 942 kW-months/year |
$(-1,080) - $ |
- - MMBtu |
$1,638 412,170 Tgal |
$17,280 4,320 gal |
$(-400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Water Disposal | Other Liquid (non-haz) | Personnel Changes |