IAC Assessment: UD0485
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0485
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product metal stampings
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 73,000
Annual Production 45,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,009 6,491,794 kWh $0.03
Electricity Demand $212,668 18,408 kW-months/year $11.55
Natural Gas $34,546 7,527 MMBtu $4.59
TOTAL ENERGY COSTS $446,223
RECOMMENDED SAVINGS* $49,334 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,295
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$600
Cost:
-
- - - - - - - - - - - - $600 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$600
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$9,600
Cost:
$1,200
$6,650 332,649 $5,910 420 - - $(-2,960) (-630) - - - - - - $6,650
332,649
kWh
$5,910
420
kW-months/year
-
-
$
$(-2,960)
(-630)
MMBtu
-
-
Tgal
-
-
gal
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,528
Cost:
$250
- - $8,608 612 $(-1,080) - - - - - - - $(-1,000) - -
-
kWh
$8,608
612
kW-months/year
$(-1,080)
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
$(-1,000)
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,249
Cost:
$12,150
$2,612 130,715 $4,637 330 - - - - - - - - - - $2,612
130,715
kWh
$4,637
330
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,439
Cost:
$6,000
- - - - - - $6,439 1,370 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,439
1,370
MMBtu
-
-
Tgal
-
-
gal
-
-
$
06: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$18,918
Cost:
$6,000
- - - - - - - - $1,638 412,170 $17,280 4,320 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,638
412,170
Tgal
$17,280
4,320
gal
-
-
$
TOTAL RECOMMENDED Savings:
$49,334
Cost:
$25,600
$9,262 463,364 $19,155 1,362 $(-1,080) - $3,479 740 $1,638 412,170 $17,280 4,320 $(-400) - $9,262
463,364
kWh
$19,155
1,362
kW-months/year
$(-1,080)
-
$
$3,479
740
MMBtu
$1,638
412,170
Tgal
$17,280
4,320
gal
$(-400)
-
$
TOTAL IMPLEMENTED Savings:
$33,295
Cost:
$18,400
$2,612 130,715 $13,245 942 $(-1,080) - - - $1,638 412,170 $17,280 4,320 $(-400) - $2,612
130,715
kWh
$13,245
942
kW-months/year
$(-1,080)
-
$
-
-
MMBtu
$1,638
412,170
Tgal
$17,280
4,320
gal
$(-400)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Other Liquid (non-haz) Personnel Changes