IAC Assessment: UD0489
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0489
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product welded steel tubing
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 209,500
Annual Production 50,000 Thousand Feet
Production Hrs. Annual 4,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,766 3,260,844 kWh $0.03
Electricity Demand $132,801 12,360 kW-months/year $10.74
Natural Gas $59,203 13,293 MMBtu $4.45
TOTAL ENERGY COSTS $298,770
RECOMMENDED SAVINGS* $20,718 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,050
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,203
Cost:
$3,000
- - $2,203 236 - - - - - - -
-
kWh
$2,203
236
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$11,117
Cost:
$15,000
$6,739 206,038 $4,033 432 $345 78 - - - - $6,739
206,038
kWh
$4,033
432
kW-months/year
$345
78
MMBtu
-
-
Tgal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,445
Cost:
$10,800
$2,249 68,875 $1,936 207 - - - - $260 - $2,249
68,875
kWh
$1,936
207
kW-months/year
-
-
MMBtu
-
-
Tgal
$260
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$488
Cost:
$100
$309 9,379 $179 19 - - - - - - $309
9,379
kWh
$179
19
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,008
Cost:
$400
- - - - - - $1,008 436,018 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,008
436,018
Tgal
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,457
Cost:
$1,000
$662 20,223 $630 32 $165 38 - - - - $662
20,223
kWh
$630
32
kW-months/year
$165
38
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$20,718
Cost:
$30,300
$9,959 304,515 $8,981 926 $510 116 $1,008 436,018 $260 - $9,959
304,515
kWh
$8,981
926
kW-months/year
$510
116
MMBtu
$1,008
436,018
Tgal
$260
-
$
TOTAL IMPLEMENTED Savings:
$16,050
Cost:
$25,900
$9,297 284,292 $6,148 658 $345 78 - - $260 - $9,297
284,292
kWh
$6,148
658
kW-months/year
$345
78
MMBtu
-
-
Tgal
$260
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes