IAC logo
IAC Assessment: UD0494
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product folding cartons
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 89
Plant Area (Sq.Ft.) 188,000
Annual Production 0 Units
Production Hrs. Annual 8,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,355 3,818,582 kWh $0.03
Electricity Demand $101,948 9,444 kW-months/year $10.80
Natural Gas $33,634 7,090 MMBtu $4.74
TOTAL ENERGY COSTS $248,937
RECOMMENDED SAVINGS* $41,819 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,396
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$12,517
Cost:
$14,000
$5,607 264,947 $4,994 348 - - - - - - - - $1,916 - $5,607
264,947
kWh
$4,994
348
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$1,916
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,890
Cost:
-
- - $8,610 600 - - - - $(-720) - - - - - -
-
kWh
$8,610
600
kW-months/year
-
-
MMBtu
-
-
gal
$(-720)
-
$
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$12,533
Cost:
-
$4,935 186,108 $3,368 312 $4,230 900 - - - - - - - - $4,935
186,108
kWh
$3,368
312
kW-months/year
$4,230
900
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$1,437
Cost:
$1,650
$664 31,653 $641 45 - - - - - - $132 - - - $664
31,653
kWh
$641
45
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$132
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,632
Cost:
$12,454
$2,696 128,370 $3,936 274 - - - - - - - - - - $2,696
128,370
kWh
$3,936
274
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$810
Cost:
-
- - - - - - $810 495 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$810
495
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$41,819
Cost:
$28,104
$13,902 611,078 $21,549 1,579 $4,230 900 $810 495 $(-720) - $132 - $1,916 - $13,902
611,078
kWh
$21,549
1,579
kW-months/year
$4,230
900
MMBtu
$810
495
gal
$(-720)
-
$
$132
-
$
$1,916
-
$
TOTAL IMPLEMENTED Savings:
$21,396
Cost:
$28,104
$8,967 424,970 $9,571 667 - - $810 495 - - $132 - $1,916 - $8,967
424,970
kWh
$9,571
667
kW-months/year
-
-
MMBtu
$810
495
gal
-
-
$
$132
-
$
$1,916
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Ancillary Material Cost