IAC Assessment: UD0499
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0499
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product pies and cakes
NAICS n/a
SIC 2053 - Frozen Bakery Products, Except Bread
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 85,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 4,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,240 3,008,499 kWh $0.03
Electricity Demand $88,788 7,331 kW-months/year $12.11
Natural Gas $43,499 9,309 MMBtu $4.67
TOTAL ENERGY COSTS $228,527
RECOMMENDED SAVINGS* $12,721 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,543
Cost:
$3,000
- - $4,543 290 - - - - - - -
-
kWh
$4,543
290
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$879
Cost:
-
- - - - - - - - $879 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$879
-
$
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,661
Cost:
$300
- - - - - - $1,805 765,000 $(-144) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,805
765,000
Tgal
$(-144)
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,886
Cost:
$3,500
$1,840 87,632 $1,880 120 $(-1,834) (-399) - - - - $1,840
87,632
kWh
$1,880
120
kW-months/year
$(-1,834)
(-399)
MMBtu
-
-
Tgal
-
-
$
05: 2.8112 COMBINE UTILITY METERS Savings:
$311
Cost:
$1,000
- - - - - - - - $311 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$311
-
$
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$251
Cost:
$604
- - - - $251 44 - - - - -
-
kWh
-
-
kW-months/year
$251
44
MMBtu
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,408
Cost:
$3,528
$338 16,120 $1,070 72 - - - - - - $338
16,120
kWh
$1,070
72
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$336
Cost:
$910
$119 5,569 $237 12 - - - - $(-20) - $119
5,569
kWh
$237
12
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-20)
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$474
Cost:
$420
$133 6,448 $344 24 - - - - $(-3) - $133
6,448
kWh
$344
24
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-3)
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$972
Cost:
-
$299 14,361 $612 36 - - - - $61 - $299
14,361
kWh
$612
36
kW-months/year
-
-
MMBtu
-
-
Tgal
$61
-
$
TOTAL RECOMMENDED Savings:
$12,721
Cost:
$13,262
$2,729 130,130 $8,686 554 $(-1,583) (-355) $1,805 765,000 $1,084 - $2,729
130,130
kWh
$8,686
554
kW-months/year
$(-1,583)
(-355)
MMBtu
$1,805
765,000
Tgal
$1,084
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes