IAC logo
IAC Assessment: UD0516
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0516
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product acids, chemicals, solvents
NAICS n/a
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 220,000
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,559 4,504,396 kWh $0.02
Electricity Demand $151,560 9,672 kW-months/year $15.67
Electricity Fees $3,573 - $ -
Natural Gas $148,045 40,054 MMBtu $3.70
TOTAL ENERGY COSTS $397,737
RECOMMENDED SAVINGS* $18,292 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,729
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,109
Cost:
$14,870
$1,393 66,237 $2,078 133 $638 - $1,393
66,237
kWh
$2,078
133
kW-months/year
$638
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,524
Cost:
$8,150
$3,397 161,782 $4,426 282 $701 - $3,397
161,782
kWh
$4,426
282
kW-months/year
$701
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,785
Cost:
$1,200
$2,973 141,559 $(-188) (-12) - - $2,973
141,559
kWh
$(-188)
(-12)
kW-months/year
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,205
Cost:
$978
$594 28,429 $611 39 - - $594
28,429
kWh
$611
39
kW-months/year
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$1,669
Cost:
$500
$353 16,706 $1,316 84 - - $353
16,706
kWh
$1,316
84
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$18,292
Cost:
$25,698
$8,710 414,713 $8,243 526 $1,339 - $8,710
414,713
kWh
$8,243
526
kW-months/year
$1,339
-
$
TOTAL IMPLEMENTED Savings:
$9,729
Cost:
$9,128
$3,991 190,211 $5,037 321 $701 - $3,991
190,211
kWh
$5,037
321
kW-months/year
$701
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes