IAC Assessment: UD0522
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0522
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1997
Principal Product Fabricated Rubber Products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 140,000
Annual Production 0 Thousand Feet
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,050 5,027,257 kWh $0.02
Electricity Demand $141,254 13,440 kW-months/year $10.51
Natural Gas $268,483 70,273 MMBtu $3.82
TOTAL ENERGY COSTS $603,582
RECOMMENDED SAVINGS* $95,607 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,006
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,126
Cost:
$6,975
$1,571 73,857 $1,555 147 - - - - - - $1,571
73,857
kWh
$1,555
147
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$647
Cost:
$2,000
$408 19,050 $239 23 - - - - - - $408
19,050
kWh
$239
23
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,104
Cost:
$16,862
$1,636 76,788 $1,468 140 - - - - - - $1,636
76,788
kWh
$1,468
140
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$33,190
Cost:
$7,500
$4,481 210,434 $7,819 744 - - $20,890 5,745,039 - - $4,481
210,434
kWh
$7,819
744
kW-months/year
-
-
MMBtu
$20,890
5,745,039
Tgal
-
-
$
05: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$22,129
Cost:
$4,000
- - - - - - $22,129 6,085,687 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,129
6,085,687
Tgal
-
-
$
06: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$18,194
Cost:
$10,000
$(-180) (-8,499) $(-164) (-16) - - $19,038 5,255,072 $(-500) - $(-180)
(-8,499)
kWh
$(-164)
(-16)
kW-months/year
-
-
MMBtu
$19,038
5,255,072
Tgal
$(-500)
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$3,644
Cost:
$3,500
$(-4) (-293) - - - - $3,648 1,003,183 - - $(-4)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
$3,648
1,003,183
Tgal
-
-
$
08: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$11,573
Cost:
$5,000
$4,568 214,537 $10,481 997 $(-3,476) (-915) - - - - $4,568
214,537
kWh
$10,481
997
kW-months/year
$(-3,476)
(-915)
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$95,607
Cost:
$55,837
$12,480 585,874 $21,398 2,035 $(-3,476) (-915) $65,705 18,088,981 $(-500) - $12,480
585,874
kWh
$21,398
2,035
kW-months/year
$(-3,476)
(-915)
MMBtu
$65,705
18,088,981
Tgal
$(-500)
-
$
TOTAL IMPLEMENTED Savings:
$29,006
Cost:
$29,837
$3,615 169,695 $3,262 310 - - $22,129 6,085,687 - - $3,615
169,695
kWh
$3,262
310
kW-months/year
-
-
MMBtu
$22,129
6,085,687
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes