IAC logo
IAC Assessment: UD0539
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0539
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Crepe paper, Drum lining paper
NAICS n/a
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 67,300
Annual Production 3,168 Tons
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,470 1,425,850 kWh $0.03
Electricity Demand $61,116 5,556 kW-months/year $11.00
Natural Gas $144,643 37,476 MMBtu $3.86
TOTAL ENERGY COSTS $259,529
RECOMMENDED SAVINGS* $51,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,386
#|Description Savings
Cost
Status Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kW-months/year $ $ $ MMBtu $ Tgal
01: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$2,210
Cost:
$3,000
- - - - - - $2,210 65 -
-
kW-months/year
-
-
$
-
-
MMBtu
$2,210
65
Tgal
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,296
Cost:
-
- - $1,296 - - - - - -
-
kW-months/year
$1,296
-
$
-
-
MMBtu
-
-
Tgal
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$39,482
Cost:
-
$39,482 3,589 - - - - - - $39,482
3,589
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$8,880
Cost:
$15,000
- - - - $6,357 1,647 $2,523 157 -
-
kW-months/year
-
-
$
$6,357
1,647
MMBtu
$2,523
157
Tgal
TOTAL RECOMMENDED Savings:
$51,868
Cost:
$18,000
$39,482 3,589 $1,296 - $6,357 1,647 $4,733 222 $39,482
3,589
kW-months/year
$1,296
-
$
$6,357
1,647
MMBtu
$4,733
222
Tgal
TOTAL IMPLEMENTED Savings:
$12,386
Cost:
$18,000
- - $1,296 - $6,357 1,647 $4,733 222 -
-
kW-months/year
$1,296
-
$
$6,357
1,647
MMBtu
$4,733
222
Tgal
Savings
Cost
$ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Demand Electricity Fees Natural Gas Water Disposal