IAC logo
IAC Assessment: UD0542
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0542
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Steel forging, rough machining, and heat treating
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 250,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 4,590
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,548 3,558,031 kWh $0.03
Electricity Demand $140,475 9,984 kW-months/year $14.07
Natural Gas $589,484 157,984 MMBtu $3.73
TOTAL ENERGY COSTS $822,507
RECOMMENDED SAVINGS* $241,945 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $207,656
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$183,600
Cost:
-
- - - - - - - - $183,600 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$183,600
-
$
-
-
$
02: 3.5244 RECOVER METALS FROM CASTING SAND Savings:
$21,000
Cost:
$4,800
- - - - - - - - - - $21,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$21,000
-
$
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$11,143
Cost:
-
- - $11,143 792 - - - - - - - - -
-
kWh
$11,143
792
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$8,400
Cost:
-
- - - - - - - - $8,400 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$8,400
-
$
-
-
$
05: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$8,000
Cost:
$17,000
- - - - $9,000 - - - $(-1,000) - - - -
-
kWh
-
-
kW-months/year
$9,000
-
$
-
-
MMBtu
$(-1,000)
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,513
Cost:
$14,128
$1,540 70,047 $2,973 211 - - - - - - - - $1,540
70,047
kWh
$2,973
211
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,236
Cost:
$20,000
- - - - - - $4,236 1,136 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,236
1,136
MMBtu
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,053
Cost:
-
$378 17,292 $675 48 - - - - - - - - $378
17,292
kWh
$675
48
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$241,945
Cost:
$55,928
$1,918 87,339 $14,791 1,051 $9,000 - $4,236 1,136 $191,000 - $21,000 - $1,918
87,339
kWh
$14,791
1,051
kW-months/year
$9,000
-
$
$4,236
1,136
MMBtu
$191,000
-
$
$21,000
-
$
TOTAL IMPLEMENTED Savings:
$207,656
Cost:
$14,128
$1,540 70,047 $14,116 1,003 - - - - $192,000 - - - $1,540
70,047
kWh
$14,116
1,003
kW-months/year
-
-
$
-
-
MMBtu
$192,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes