IAC Assessment: UD0543
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0543
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Quartz Manchining, Grinding, lapping, and polishing
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 48
Plant Area (Sq.Ft.) 25,000
Annual Production 350,000 Pounds
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $18,421 712,192 kWh $0.03
Electricity Demand $24,988 1,776 kW-months/year $14.07
Natural Gas $7,994 1,631 MMBtu $4.90
TOTAL ENERGY COSTS $55,046
RECOMMENDED SAVINGS* $338,554 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $75,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$256,936
Cost:
$100,000
- - - - - - $256,936 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$256,936
-
$
-
-
$
-
-
$
02: 3.2135 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING Savings:
$45,731
Cost:
$4,000
- - - - - - - - $(-600) - $46,331 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$(-600)
-
$
$46,331
-
$
03: 3.2135 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING Savings:
$21,625
Cost:
$4,000
- - - - $13,230 - - - $(-600) - $8,995 - -
-
kWh
-
-
kW-months/year
$13,230
-
$
-
-
$
$(-600)
-
$
$8,995
-
$
04: 3.2135 EXTEND SOLUTION LIFE WITH FILTERING OR CARBONATE FREEZING Savings:
$6,584
Cost:
$10,000
- - - - $5,292 - - - $(-1,800) - $3,092 - -
-
kWh
-
-
kW-months/year
$5,292
-
$
-
-
$
$(-1,800)
-
$
$3,092
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,018
Cost:
$16,558
$2,352 90,563 $3,666 261 - - - - - - - - $2,352
90,563
kWh
$3,666
261
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$1,660
Cost:
-
- - $1,660 118 - - - - - - - - -
-
kWh
$1,660
118
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$338,554
Cost:
$134,558
$2,352 90,563 $5,326 379 $18,522 - $256,936 - $(-3,000) - $58,418 - $2,352
90,563
kWh
$5,326
379
kW-months/year
$18,522
-
$
$256,936
-
$
$(-3,000)
-
$
$58,418
-
$
TOTAL IMPLEMENTED Savings:
$75,600
Cost:
$18,000
- - $1,660 118 $18,522 - - - $(-3,000) - $58,418 - -
-
kWh
$1,660
118
kW-months/year
$18,522
-
$
-
-
$
$(-3,000)
-
$
$58,418
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Personnel Changes Primary Raw Material Ancillary Material Cost By-product Production