IAC logo
IAC Assessment: UD0546
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0546
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Precast and prestressed concrete products
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 45,000
Annual Production 0 Units
Production Hrs. Annual 4,050
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,433 1,209,261 kWh $0.03
Electricity Demand $66,016 4,692 kW-months/year $14.07
Natural Gas $56,926 10,516 MMBtu $5.41
TOTAL ENERGY COSTS $154,375
RECOMMENDED SAVINGS* $14,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,332
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$4,349
Cost:
-
- - - - - - $4,349 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,349
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,580
Cost:
-
$1,737 66,823 - - - - $843 - - - $1,737
66,823
kWh
-
-
kW-months/year
-
-
MMBtu
$843
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,450
Cost:
$6,900
$588 22,567 $1,675 119 - - $187 - - - $588
22,567
kWh
$1,675
119
kW-months/year
-
-
MMBtu
$187
-
$
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,403
Cost:
$4,000
$876 33,705 $2,246 160 $(-719) (-144) - - - - $876
33,705
kWh
$2,246
160
kW-months/year
$(-719)
(-144)
MMBtu
-
-
$
-
-
$
05: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$1,933
Cost:
-
- - - - - - - - $1,933 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,933
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$622
Cost:
$600
- - - - $622 124 - - - - -
-
kWh
-
-
kW-months/year
$622
124
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$14,337
Cost:
$11,500
$3,201 123,095 $3,921 279 $(-97) (-20) $5,379 - $1,933 - $3,201
123,095
kWh
$3,921
279
kW-months/year
$(-97)
(-20)
MMBtu
$5,379
-
$
$1,933
-
$
TOTAL IMPLEMENTED Savings:
$9,332
Cost:
$4,000
$2,613 100,528 $2,246 160 $(-719) (-144) $5,192 - - - $2,613
100,528
kWh
$2,246
160
kW-months/year
$(-719)
(-144)
MMBtu
$5,192
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost