Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1998 |
Principal Product | Wire ,cold drawn and hot rolled steel, spring, coiling and f |
NAICS | n/a |
SIC | 3315 - Steel Wire And Related Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 197,650 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $359,477 | 8,623,681 | kWh | $0.04 |
Electricity Demand | $112,343 | 30,528 | kW-months/year | $3.68 |
Natural Gas | $274,316 | 67,355 | MMBtu | $4.07 |
TOTAL ENERGY COSTS | $793,998 | |||
RECOMMENDED SAVINGS* | $205,151 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,609 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $101,400 Cost: $60,000 |
- | - | - | - | - | - | $101,400 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$101,400 - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $47,736 Cost: $2,000 |
- | - | - | - | - | - | - | - | $47,736 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$47,736 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $28,560 Cost: $8,000 |
- | - | - | - | - | - | - | - | $28,560 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$28,560 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $19,707 Cost: $21,120 |
- | - | - | - | $19,707 | 4,939 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$19,707 4,939 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $4,026 Cost: $1,850 |
- | - | - | - | $4,026 | 1,009 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,026 1,009 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,699 Cost: $6,419 |
$1,242 | 32,239 | $457 | 124 | - | - | - | - | - | - | - | - |
$1,242 32,239 kWh |
$457 124 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2514 COVER OPEN TANKS |
Savings: $2,023 Cost: $1,050 |
- | - | - | - | $686 | 172 | - | - | - | - | $1,337 | - |
- - kWh |
- - kW-months/year |
$686 172 MMBtu |
- - lb |
- - $ |
$1,337 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $205,151 Cost: $100,439 |
$1,242 | 32,239 | $457 | 124 | $24,419 | 6,120 | $101,400 | - | $76,296 | - | $1,337 | - | $1,242 32,239 kWh |
$457 124 kW-months/year |
$24,419 6,120 MMBtu |
$101,400 - lb |
$76,296 - $ |
$1,337 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,609 Cost: $10,900 |
- | - | - | - | $4,712 | 1,181 | - | - | $28,560 | - | $1,337 | - | - - kWh |
- - kW-months/year |
$4,712 1,181 MMBtu |
- - lb |
$28,560 - $ |
$1,337 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Water Consumption |