IAC logo
IAC Assessment: UD0554
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0554
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1998
Principal Product Wire ,cold drawn and hot rolled steel, spring, coiling and f
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 197,650
Annual Production 3,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $359,477 8,623,681 kWh $0.04
Electricity Demand $112,343 30,528 kW-months/year $3.68
Natural Gas $274,316 67,355 MMBtu $4.07
TOTAL ENERGY COSTS $793,998
RECOMMENDED SAVINGS* $205,151 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,609
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ Tgal
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$101,400
Cost:
$60,000
- - - - - - $101,400 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$101,400
-
lb
-
-
$
-
-
Tgal
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$47,736
Cost:
$2,000
- - - - - - - - $47,736 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$47,736
-
$
-
-
Tgal
03: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$28,560
Cost:
$8,000
- - - - - - - - $28,560 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$28,560
-
$
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$19,707
Cost:
$21,120
- - - - $19,707 4,939 - - - - - - -
-
kWh
-
-
kW-months/year
$19,707
4,939
MMBtu
-
-
lb
-
-
$
-
-
Tgal
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,026
Cost:
$1,850
- - - - $4,026 1,009 - - - - - - -
-
kWh
-
-
kW-months/year
$4,026
1,009
MMBtu
-
-
lb
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,699
Cost:
$6,419
$1,242 32,239 $457 124 - - - - - - - - $1,242
32,239
kWh
$457
124
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
07: 2.2514 COVER OPEN TANKS Savings:
$2,023
Cost:
$1,050
- - - - $686 172 - - - - $1,337 - -
-
kWh
-
-
kW-months/year
$686
172
MMBtu
-
-
lb
-
-
$
$1,337
-
Tgal
TOTAL RECOMMENDED Savings:
$205,151
Cost:
$100,439
$1,242 32,239 $457 124 $24,419 6,120 $101,400 - $76,296 - $1,337 - $1,242
32,239
kWh
$457
124
kW-months/year
$24,419
6,120
MMBtu
$101,400
-
lb
$76,296
-
$
$1,337
-
Tgal
TOTAL IMPLEMENTED Savings:
$34,609
Cost:
$10,900
- - - - $4,712 1,181 - - $28,560 - $1,337 - -
-
kWh
-
-
kW-months/year
$4,712
1,181
MMBtu
-
-
lb
$28,560
-
$
$1,337
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Water Consumption