IAC logo
IAC Assessment: UD0561
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0561
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1999
Principal Product Metalworking lathes and repair parts
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 135,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,956 2,021,395 kWh $0.05
Electricity Demand $96,033 6,806 kW-months/year $14.11
Natural Gas $31,413 6,557 MMBtu $4.79
TOTAL ENERGY COSTS $222,375
RECOMMENDED SAVINGS* $125,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,984
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ $ $ gal $ gal $ $ $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$100,000
Cost:
$200,000
- - - - - - - - - - - - $100,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
gal
-
-
$
$100,000
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$12,265
Cost:
$5,000
- - - - $12,265 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$12,265
-
$
-
-
gal
-
-
gal
-
-
$
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,566
Cost:
$8,140
$1,214 57,737 $4,352 308 - - - - - - - - - - $1,214
57,737
kWh
$4,352
308
kW-months/year
-
-
$
-
-
gal
-
-
gal
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,418
Cost:
$14,216
$1,071 50,996 $3,347 237 - - - - - - - - - - $1,071
50,996
kWh
$3,347
237
kW-months/year
-
-
$
-
-
gal
-
-
gal
-
-
$
-
-
$
05: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$1,139
Cost:
$3,000
- - - - - - $479 1,237 - - $660 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$479
1,237
gal
-
-
gal
$660
-
$
-
-
$
06: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$942
Cost:
$3,000
- - - - - - - - $297 149 $645 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$297
149
gal
$645
-
$
-
-
$
07: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$877
Cost:
-
$191 9,086 $686 49 - - - - - - - - - - $191
9,086
kWh
$686
49
kW-months/year
-
-
$
-
-
gal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$125,207
Cost:
$233,356
$2,476 117,819 $8,385 594 $12,265 - $479 1,237 $297 149 $1,305 - $100,000 - $2,476
117,819
kWh
$8,385
594
kW-months/year
$12,265
-
$
$479
1,237
gal
$297
149
gal
$1,305
-
$
$100,000
-
$
TOTAL IMPLEMENTED Savings:
$9,984
Cost:
$22,356
$2,285 108,733 $7,699 545 - - - - - - - - - - $2,285
108,733
kWh
$7,699
545
kW-months/year
-
-
$
-
-
gal
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ gal $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Other Liquid (haz) Ancillary Material Cost Primary Product