IAC logo
IAC Assessment: UD0563
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0563
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1999
Principal Product ferrous metal castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 100,000
Annual Production 4,200 Tons
Production Hrs. Annual 2,400
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,942 6,550,117 kWh $0.02
Electricity Demand $258,938 18,456 kW-months/year $14.03
Natural Gas $69,144 16,075 MMBtu $4.30
TOTAL ENERGY COSTS $531,020
RECOMMENDED SAVINGS* $144,946 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,577
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $
01: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$29,762
Cost:
$4,400
- - - - $(-729) (-170) - - $1,700 - $8,750 - $20,041 - - - -
-
kWh
-
-
kW-months/year
$(-729)
(-170)
MMBtu
-
-
lb
$1,700
-
lb
$8,750
-
$
$20,041
-
$
-
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$30,000
Cost:
$6,648
- - - - - - - - - - - - - - $30,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
$30,000
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$26,365
Cost:
$31,000
$10,775 513,189 $15,590 1,111 - - - - - - - - - - - - $10,775
513,189
kWh
$15,590
1,111
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$20,536
Cost:
$3,000
- - $30,136 2,148 - - - - - - $(-9,600) - - - - - -
-
kWh
$30,136
2,148
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$(-9,600)
-
$
-
-
$
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$17,707
Cost:
$550
- - - - - - - - $1,700 - $3,150 - $12,857 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,700
-
lb
$3,150
-
$
$12,857
-
$
-
-
$
06: 3.5222 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) Savings:
$13,484
Cost:
$2,645
- - - - - - $13,484 6,912,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,484
6,912,000
lb
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,212
Cost:
$9,270
$955 45,428 $2,839 202 - - - - - - $418 - - - - - $955
45,428
kWh
$2,839
202
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$418
-
$
-
-
$
-
-
$
08: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,880
Cost:
$8,471
- - - - $2,880 670 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$2,880
670
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$144,946
Cost:
$65,984
$11,730 558,617 $48,565 3,461 $2,151 500 $13,484 6,912,000 $3,400 - $2,718 - $32,898 - $30,000 - $11,730
558,617
kWh
$48,565
3,461
kW-months/year
$2,151
500
MMBtu
$13,484
6,912,000
lb
$3,400
-
lb
$2,718
-
$
$32,898
-
$
$30,000
-
$
TOTAL IMPLEMENTED Savings:
$30,577
Cost:
$40,270
$11,730 558,617 $18,429 1,313 - - - - - - $418 - - - - - $11,730
558,617
kWh
$18,429
1,313
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$418
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Primary Raw Material Ancillary Material Cost