IAC logo
IAC Assessment: UD0595
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0595
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2000
Principal Product flavoring extracts and syrups
NAICS n/a
SIC 2087 - Flavoring Extracts And Syrups, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 65,000
Annual Production 52,000,000 Pounds
Production Hrs. Annual 6,732
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,003 5,470,692 kWh $0.02
Electricity Demand $121,974 8,700 kW-months/year $14.02
Natural Gas $199,088 54,671 MMBtu $3.64
TOTAL ENERGY COSTS $439,065
RECOMMENDED SAVINGS* $461,644 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ $
01: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$330,000
Cost:
-
- - - - - - - - $330,000 1,000,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$330,000
1,000,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$96,096
Cost:
$106,000
- - - - - - - - - - $96,096 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$96,096
-
$
-
-
$
-
-
$
-
-
$
03: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$14,451
Cost:
$5,000
- - - - - - - - - - $11,781 - $375 - $2,295 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$11,781
-
$
$375
-
$
$2,295
-
$
-
-
$
04: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$11,016
Cost:
$20,400
- - - - - - - - - - - - - - - - $11,016 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
$11,016
-
$
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$8,851
Cost:
$2,000
- - - - $5,511 1,514 $2,678 2,059,992 - - - - - - $662 - - - -
-
kWh
-
-
kW-months/year
$5,511
1,514
MMBtu
$2,678
2,059,992
Tgal
-
-
lb
-
-
$
-
-
$
$662
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,230
Cost:
$846
$520 19,930 $555 40 - - - - - - - - $155 - - - - - $520
19,930
kWh
$555
40
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$155
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$461,644
Cost:
$134,246
$520 19,930 $555 40 $5,511 1,514 $2,678 2,059,992 $330,000 1,000,000 $107,877 - $530 - $2,957 - $11,016 - $520
19,930
kWh
$555
40
kW-months/year
$5,511
1,514
MMBtu
$2,678
2,059,992
Tgal
$330,000
1,000,000
lb
$107,877
-
$
$530
-
$
$2,957
-
$
$11,016
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Primary Product