IAC Assessment: UD0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2001
Principal Product Industrial Machinery
NAICS n/a
SIC 3542 - Machine Tools, Metal Forming Types
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 235,000
Annual Production 1,450 Pieces
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,200 1,234,332 kWh $0.03
Electricity Demand $41,184 5,148 kW-months/year $8.00
Natural Gas $90,929 17,136 MMBtu $5.31
TOTAL ENERGY COSTS $187,767
RECOMMENDED SAVINGS* $69,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,569
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$32,488
Cost:
$128,084
- - - - $20,496 2,562 $2,112 400,982 - - - - $9,880 - - - -
-
kWh
-
-
kW-months/year
$20,496
2,562
MMBtu
$2,112
400,982
Tgal
-
-
gal
-
-
gal
$9,880
-
$
-
-
$
02: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$13,412
Cost:
$700
- - - - - - - - - - $9,068 840 - - $4,344 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$9,068
840
gal
-
-
$
$4,344
-
$
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$12,127
Cost:
$196
- - - - - - $12,127 2,302,652 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,127
2,302,652
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$3,421
Cost:
$11,978
- - - - $3,421 341 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,421
341
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,301
Cost:
$1,000
- - - - - - - - $2,301 436,890 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$2,301
436,890
gal
-
-
gal
-
-
$
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$1,740
Cost:
$22
- - - - - - - - $1,740 16,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,740
16,000
gal
-
-
gal
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,534
Cost:
$1,619
$766 24,549 $768 96 - - - - - - - - - - - - $766
24,549
kWh
$768
96
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$756
Cost:
$3,000
- - - - - - - - - - - - $756 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
$756
-
$
-
-
$
09: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$675
Cost:
$225
$27 864 - - $648 81 - - - - - - - - - - $27
864
kWh
-
-
kW-months/year
$648
81
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$641
Cost:
$436
$285 9,200 $356 44 - - - - - - - - - - - - $285
9,200
kWh
$356
44
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$69,095
Cost:
$147,260
$1,078 34,613 $1,124 140 $24,565 2,984 $14,239 2,703,634 $4,041 452,890 $9,068 840 $10,636 - $4,344 - $1,078
34,613
kWh
$1,124
140
kW-months/year
$24,565
2,984
MMBtu
$14,239
2,703,634
Tgal
$4,041
452,890
gal
$9,068
840
gal
$10,636
-
$
$4,344
-
$
TOTAL IMPLEMENTED Savings:
$29,569
Cost:
$5,537
$766 24,549 $768 96 - - $12,127 2,302,652 $1,740 16,000 $9,068 840 $756 - $4,344 - $766
24,549
kWh
$768
96
kW-months/year
-
-
MMBtu
$12,127
2,302,652
Tgal
$1,740
16,000
gal
$9,068
840
gal
$756
-
$
$4,344
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Other Liquid (haz) Administrative Changes Ancillary Material Cost