IAC logo
IAC Assessment: UD0660
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0660
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2003
Principal Product Fine blank components
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 100,000
Annual Production 12,500,000 Pieces
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,972 6,157,200 kWh $0.02
Electricity Demand $302,648 21,600 kW-months/year $14.01
Electricity Fees $4,451 - $ -
Natural Gas $101,376 11,268 MMBtu $9.00
TOTAL ENERGY COSTS $546,447
RECOMMENDED SAVINGS* $395,253 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,809
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $ $ %
01: 4.6250 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$280,000
Cost:
$58,320
- - - - - - - - - - - - - - $280,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
$280,000
-
%
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$31,779
Cost:
-
$13,622 619,200 $18,157 1,296 - - - - - - - - - - - - $13,622
619,200
kWh
$18,157
1,296
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
03: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$19,375
Cost:
$4,323
- - - - - - $24,023 6,847 $(-4,648) - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,023
6,847
gal
$(-4,648)
-
$
-
-
$
-
-
$
-
-
%
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$15,291
Cost:
$7,000
- - - - $15,291 1,699 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$15,291
1,699
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
05: 2.7314 REDUCE VENTILATION AIR Savings:
$8,388
Cost:
$15,000
- - - - $8,388 932 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,388
932
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$7,666
Cost:
$1,124
$3,379 153,600 $4,287 306 - - - - - - - - - - - - $3,379
153,600
kWh
$4,287
306
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
07: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,568
Cost:
$6,545
$7,286 331,200 $7,733 588 $(-13,851) (-1,539) - - $4,400 - - - - - - - $7,286
331,200
kWh
$7,733
588
kW-months/year
$(-13,851)
(-1,539)
MMBtu
-
-
gal
$4,400
-
$
-
-
$
-
-
$
-
-
%
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$5,026
Cost:
$8,400
- - - - - - $11,026 2,195 - - $(-6,000) - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,026
2,195
gal
-
-
$
$(-6,000)
-
$
-
-
$
-
-
%
09: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$3,983
Cost:
$14,150
$1,932 87,840 $2,051 146 - - - - - - - - - - - - $1,932
87,840
kWh
$2,051
146
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
10: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,648
Cost:
-
- - $3,648 260 - - - - - - - - - - - - -
-
kWh
$3,648
260
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,905
Cost:
$7,338
$1,409 64,080 $1,496 107 - - - - - - - - - - - - $1,409
64,080
kWh
$1,496
107
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
12: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,763
Cost:
$3,318
$1,115 50,700 $1,648 118 - - - - - - - - - - - - $1,115
50,700
kWh
$1,648
118
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
13: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$2,019
Cost:
$4,158
$19 867 - - - - - - - - - - $2,000 - - - $19
867
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
$2,000
-
$
-
-
%
14: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$1,707
Cost:
-
- - $3,867 276 - - - - $(-2,160) - - - - - - - -
-
kWh
$3,867
276
kW-months/year
-
-
MMBtu
-
-
gal
$(-2,160)
-
$
-
-
$
-
-
$
-
-
%
15: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,443
Cost:
$1,000
$686 31,200 $757 54 - - - - - - - - - - - - $686
31,200
kWh
$757
54
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
16: 2.2223 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF Savings:
$1,260
Cost:
-
- - - - $1,260 140 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,260
140
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
17: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,080
Cost:
$4,200
$878 39,888 $202 14 - - - - - - - - - - - - $878
39,888
kWh
$202
14
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
18: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$946
Cost:
$2,442
$459 20,880 $487 35 - - - - - - - - - - - - $459
20,880
kWh
$487
35
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
19: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$256
Cost:
$167
$110 5,011 $146 10 - - - - - - - - - - - - $110
5,011
kWh
$146
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
20: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$150
Cost:
-
$150 6,840 - - - - - - - - - - - - - - $150
6,840
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$395,253
Cost:
$137,485
$31,045 1,411,306 $44,479 3,210 $11,088 1,232 $35,049 9,042 $(-2,408) - $(-6,000) - $2,000 - $280,000 - $31,045
1,411,306
kWh
$44,479
3,210
kW-months/year
$11,088
1,232
MMBtu
$35,049
9,042
gal
$(-2,408)
-
$
$(-6,000)
-
$
$2,000
-
$
$280,000
-
%
TOTAL IMPLEMENTED Savings:
$50,809
Cost:
$27,718
$15,573 707,940 $20,562 1,468 $9,648 1,072 $11,026 2,195 - - $(-6,000) - - - - - $15,573
707,940
kWh
$20,562
1,468
kW-months/year
$9,648
1,072
MMBtu
$11,026
2,195
gal
-
-
$
$(-6,000)
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Increase in Production