IAC Assessment: UD0666
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0666
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2003
Principal Product Molded plastic parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 40,000
Annual Production 1,000,000 Pounds
Production Hrs. Annual 5,880
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,850 2,650,904 kWh $0.03
Electricity Demand $84,150 6,420 kW-months/year $13.11
Natural Gas $7,924 1,171 MMBtu $6.77
TOTAL ENERGY COSTS $179,885
RECOMMENDED SAVINGS* $76,542 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,492
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$21,034
Cost:
-
- - $21,274 1,604 $(-240) - - - - - -
-
kWh
$21,274
1,604
kW-months/year
$(-240)
-
$
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,698
Cost:
-
$(-397) (-14,208) $19,015 1,434 - - - - $(-1,920) - $(-397)
(-14,208)
kWh
$19,015
1,434
kW-months/year
-
-
$
-
-
MMBtu
$(-1,920)
-
$
03: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$14,700
Cost:
-
- - - - - - - - $14,700 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$14,700
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,180
Cost:
-
$2,635 94,080 $2,545 192 - - - - - - $2,635
94,080
kWh
$2,545
192
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,885
Cost:
-
$1,975 70,560 $1,910 144 - - - - - - $1,975
70,560
kWh
$1,910
144
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,247
Cost:
$325
$322 11,490 $311 56 - - $2,614 385 - - $322
11,490
kWh
$311
56
kW-months/year
-
-
$
$2,614
385
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,082
Cost:
-
$1,427 50,960 $1,655 125 - - - - - - $1,427
50,960
kWh
$1,655
125
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,266
Cost:
$8,500
$1,152 41,160 $1,114 84 - - - - - - $1,152
41,160
kWh
$1,114
84
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,000
Cost:
-
$1,020 36,456 $980 74 - - - - - - $1,020
36,456
kWh
$980
74
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,000
Cost:
$2,020
$510 18,230 $490 38 - - - - - - $510
18,230
kWh
$490
38
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$835
Cost:
$1,700
$835 29,819 - - - - - - - - $835
29,819
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
12: 2.7122 DISCONNECT BALLASTS Savings:
$810
Cost:
-
$410 14,700 $400 30 - - - - - - $410
14,700
kWh
$400
30
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
13: 2.7122 DISCONNECT BALLASTS Savings:
$740
Cost:
$100
$380 13,525 $360 28 - - - - - - $380
13,525
kWh
$360
28
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
14: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$635
Cost:
$150
$635 22,640 - - - - - - - - $635
22,640
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$255
Cost:
$720
$130 4,700 $125 10 - - - - - - $130
4,700
kWh
$125
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
16: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$175
Cost:
-
$175 6,250 - - - - - - - - $175
6,250
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$76,542
Cost:
$13,515
$11,209 400,362 $50,179 3,819 $(-240) - $2,614 385 $12,780 - $11,209
400,362
kWh
$50,179
3,819
kW-months/year
$(-240)
-
$
$2,614
385
MMBtu
$12,780
-
$
TOTAL IMPLEMENTED Savings:
$59,492
Cost:
$2,020
$3,283 117,288 $43,669 3,294 $(-240) - - - $12,780 - $3,283
117,288
kWh
$43,669
3,294
kW-months/year
$(-240)
-
$
-
-
MMBtu
$12,780
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes