Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2003 |
Principal Product | injection molded plastic parts |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 35,000 |
Annual Production | 7,785,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $48,900 | 1,275,680 | kWh | $0.04 |
Electricity Demand | $62,200 | 5,244 | kW-months/year | $11.86 |
Natural Gas | $7,641 | 1,083 | MMBtu | $7.06 |
TOTAL ENERGY COSTS | $122,138 | |||
RECOMMENDED SAVINGS* | $38,005 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,720 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $30,335 Cost: $50,000 |
- | - | - | - | - | - | $3,085 | - | $27,250 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$3,085 - $ |
$27,250 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,720 Cost: $11,700 |
$1,400 | 40,000 | $1,320 | 115 | - | - | - | - | - | - |
$1,400 40,000 kWh |
$1,320 115 kW-months/year |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,600 Cost: $4,625 |
$1,730 | 52,400 | $870 | 72 | - | - | - | - | - | - |
$1,730 52,400 kWh |
$870 72 kW-months/year |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY |
Savings: $1,225 Cost: - |
$1,225 | 37,065 | - | - | - | - | - | - | - | - |
$1,225 37,065 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $925 Cost: - |
- | - | - | - | $925 | 374,050 | - | - | - | - |
- - kWh |
- - kW-months/year |
$925 374,050 Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $200 Cost: - |
$200 | 6,000 | - | - | - | - | - | - | - | - |
$200 6,000 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $38,005 Cost: $66,325 |
$4,555 | 135,465 | $2,190 | 187 | $925 | 374,050 | $3,085 | - | $27,250 | - | $4,555 135,465 kWh |
$2,190 187 kW-months/year |
$925 374,050 Tgal |
$3,085 - $ |
$27,250 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,720 Cost: $11,700 |
$1,400 | 40,000 | $1,320 | 115 | - | - | - | - | - | - | $1,400 40,000 kWh |
$1,320 115 kW-months/year |
- - Tgal |
- - $ |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Increase in Production |