IAC logo
IAC Assessment: UD0683
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0683
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2003
Principal Product injection molded plastic parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 26
Plant Area (Sq.Ft.) 35,000
Annual Production 7,785,000 Pieces
Production Hrs. Annual 4,160
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,900 1,275,680 kWh $0.04
Electricity Demand $62,200 5,244 kW-months/year $11.86
Natural Gas $7,641 1,083 MMBtu $7.06
TOTAL ENERGY COSTS $122,138
RECOMMENDED SAVINGS* $38,005 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,720
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production
$ kWh $ kW-months/year $ Tgal $ $ $ %
01: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$30,335
Cost:
$50,000
- - - - - - $3,085 - $27,250 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$3,085
-
$
$27,250
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,720
Cost:
$11,700
$1,400 40,000 $1,320 115 - - - - - - $1,400
40,000
kWh
$1,320
115
kW-months/year
-
-
Tgal
-
-
$
-
-
%
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,600
Cost:
$4,625
$1,730 52,400 $870 72 - - - - - - $1,730
52,400
kWh
$870
72
kW-months/year
-
-
Tgal
-
-
$
-
-
%
04: 2.6241 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY Savings:
$1,225
Cost:
-
$1,225 37,065 - - - - - - - - $1,225
37,065
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$925
Cost:
-
- - - - $925 374,050 - - - - -
-
kWh
-
-
kW-months/year
$925
374,050
Tgal
-
-
$
-
-
%
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$200
Cost:
-
$200 6,000 - - - - - - - - $200
6,000
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$38,005
Cost:
$66,325
$4,555 135,465 $2,190 187 $925 374,050 $3,085 - $27,250 - $4,555
135,465
kWh
$2,190
187
kW-months/year
$925
374,050
Tgal
$3,085
-
$
$27,250
-
%
TOTAL IMPLEMENTED Savings:
$2,720
Cost:
$11,700
$1,400 40,000 $1,320 115 - - - - - - $1,400
40,000
kWh
$1,320
115
kW-months/year
-
-
Tgal
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ %
Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production Electricity Usage Electricity Demand Water Disposal Personnel Changes Increase in Production