IAC Assessment: UD0685
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0685
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Air and gas compressors
NAICS 333912 - Air and Gas Compressor Manufacturing
SIC 3563 - Air And Gas Compressors
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 250,000
Annual Production 1,211 Pieces
Production Hrs. Annual 2,805
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,862 3,765,538 kWh $0.03
Electricity Demand $195,138 13,896 kW-months/year $14.04
Natural Gas $154,845 19,164 MMBtu $8.08
TOTAL ENERGY COSTS $471,623
RECOMMENDED SAVINGS* $93,260 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,965
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$40,625
Cost:
-
- - $40,625 3,144 - - - - - - -
-
kWh
$40,625
3,144
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,440
Cost:
$4,000
$1,900 350,625 $19,400 1,500 - - $(-860) - $1,000 - $1,900
350,625
kWh
$19,400
1,500
kW-months/year
-
-
MMBtu
$(-860)
-
$
$1,000
-
$
03: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$9,450
Cost:
-
- - - - - - $9,450 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,450
-
$
-
-
$
04: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$5,855
Cost:
$1,900
$1,820 72,930 $4,035 312 - - - - - - $1,820
72,930
kWh
$4,035
312
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,880
Cost:
-
- - $3,880 300 - - - - - - -
-
kWh
$3,880
300
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$4,540
Cost:
-
$250 9,659 $700 54 $3,590 444 - - - - $250
9,659
kWh
$700
54
kW-months/year
$3,590
444
MMBtu
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,020
Cost:
-
$3,020 116,150 - - - - - - - - $3,020
116,150
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,970
Cost:
$420
$950 36,465 $2,020 156 - - - - - - $950
36,465
kWh
$2,020
156
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,480
Cost:
$2,730
- - - - $1,480 183 - - - - -
-
kWh
-
-
kW-months/year
$1,480
183
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$93,260
Cost:
$9,050
$7,940 585,829 $70,660 5,466 $5,070 627 $8,590 - $1,000 - $7,940
585,829
kWh
$70,660
5,466
kW-months/year
$5,070
627
MMBtu
$8,590
-
$
$1,000
-
$
TOTAL IMPLEMENTED Savings:
$65,965
Cost:
$3,150
$4,220 162,274 $47,225 3,654 $5,070 627 $9,450 - - - $4,220
162,274
kWh
$47,225
3,654
kW-months/year
$5,070
627
MMBtu
$9,450
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost