Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Heat treated parts
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 20,000
Annual Production 3,812,630 Pounds
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,647 1,772,000 kWh $0.03
Electricity Demand $75,156 5,712 kW-months/year $13.16
Natural Gas $134,023 15,351 MMBtu $8.73
TOTAL ENERGY COSTS $272,082
RECOMMENDED SAVINGS* $36,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,297
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,224
Cost:
$7,681
- - - - $17,224 1,973 - - - - -
-
kWh
-
-
kW-months/year
$17,224
1,973
MMBtu
-
-
$
-
-
$
02: 2.2514 COVER OPEN TANKS Savings:
$6,907
Cost:
$1,110
$3,243 120,120 $3,341 252 $323 37 - - - - $3,243
120,120
kWh
$3,341
252
kW-months/year
$323
37
MMBtu
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,095
Cost:
-
- - - - - - - - $4,095 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,095
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,750
Cost:
-
- - - - - - $3,750 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,750
-
$
-
-
$
05: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS Savings:
$2,043
Cost:
$2,478
- - - - $2,043 234 - - - - -
-
kWh
-
-
kW-months/year
$2,043
234
MMBtu
-
-
$
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$885
Cost:
$667
$455 16,848 $430 32 - - - - - - $455
16,848
kWh
$430
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$620
Cost:
$240
$320 11,860 $300 23 - - - - - - $320
11,860
kWh
$300
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$392
Cost:
$450
$205 7,605 $159 12 - - - - $28 - $205
7,605
kWh
$159
12
kW-months/year
-
-
MMBtu
-
-
$
$28
-
$
09: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$285
Cost:
-
- - - - - - $285 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$285
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$196
Cost:
$297
$101 3,744 $95 7 - - - - - - $101
3,744
kWh
$95
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.2312 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS Savings:
$63
Cost:
$15
- - - - $63 7 - - - - -
-
kWh
-
-
kW-months/year
$63
7
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$36,460
Cost:
$12,938
$4,324 160,177 $4,325 326 $19,653 2,251 $4,035 - $4,123 - $4,324
160,177
kWh
$4,325
326
kW-months/year
$19,653
2,251
MMBtu
$4,035
-
$
$4,123
-
$
TOTAL IMPLEMENTED Savings:
$1,297
Cost:
$690
$525 19,465 $459 35 - - $285 - $28 - $525
19,465
kWh
$459
35
kW-months/year
-
-
MMBtu
$285
-
$
$28
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost