IAC logo
IAC Assessment: UD0687
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0687
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2004
Principal Product Coolant filtration equip.
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 130,000
Annual Production 2,200,000 Pounds
Production Hrs. Annual 2,125
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,647 1,149,140 kWh $0.05
Electricity Demand $75,156 5,496 kW-months/year $13.67
Natural Gas $51,845 7,508 MMBtu $6.91
TOTAL ENERGY COSTS $186,166
RECOMMENDED SAVINGS* $24,793 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,933
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,973
Cost:
$1,000
$2,617 67,109 $2,356 288 - - - - $2,617
67,109
kWh
$2,356
288
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,400
Cost:
$1,230
- - - - $4,400 586 - - -
-
kWh
-
-
kW-months/year
$4,400
586
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,090
Cost:
-
- - - - - - $4,090 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,090
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,420
Cost:
$9,650
$1,565 40,160 $1,855 228 - - - - $1,565
40,160
kWh
$1,855
228
kW-months/year
-
-
MMBtu
-
-
$
05: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS Savings:
$2,740
Cost:
$540
$170 4,409 - - $2,570 342 - - $170
4,409
kWh
-
-
kW-months/year
$2,570
342
MMBtu
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$2,430
Cost:
$2,610
$1,660 42,500 $770 240 - - - - $1,660
42,500
kWh
$770
240
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,030
Cost:
$2,350
$930 23,800 $1,100 134 - - - - $930
23,800
kWh
$1,100
134
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$365
Cost:
$450
$165 4,250 $200 24 - - - - $165
4,250
kWh
$200
24
kW-months/year
-
-
MMBtu
-
-
$
09: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$180
Cost:
$649
$147 3,757 $33 5 - - - - $147
3,757
kWh
$33
5
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$165
Cost:
$15
$75 1,910 $90 11 - - - - $75
1,910
kWh
$90
11
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,793
Cost:
$18,494
$7,329 187,895 $6,404 930 $6,970 928 $4,090 - $7,329
187,895
kWh
$6,404
930
kW-months/year
$6,970
928
MMBtu
$4,090
-
$
TOTAL IMPLEMENTED Savings:
$7,933
Cost:
$4,075
$4,517 115,769 $3,416 563 - - - - $4,517
115,769
kWh
$3,416
563
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes